This means the walls will be the thickness of these blocks (12cm) plus a little extra for the plaster / cement coating.
In the background of the photo you can see the wooden structure put together to mark out the location of the trenches to be dug.
The ground needed no cleaning or levelling before they started these layout preparations. I was expecting them to check it was completely level but it seems it was already level enough.
No comments:
Post a Comment